Overall Health Score
80/100
Amber
Total Epics
19
Release 4 & Release 5
Completed
0
0.0% of epics
In Progress
4
21.1% of epics
At Risk
1
5.3% of epics
Blocked
1
5.3% of epics
Mapping Confidence
90.0%
14/14 mapped
Epic
Overall Status
Start
Plan Finish
Forecast
Variance
Jun 2026
Jul 2026
Aug 2026
Sep 2026
Oct 2026
Nov 2026
Dec 2026
29
6
13
20
27
3
10
17
24
31
7
14
21
28
5
12
19
26
2
9
16
23
30
7
Today
Review and finalise business process
Completed
6 Jul 2026
9 Jul 2026
—
—
Source Policy
Completed
10 Jul 2026
14 Jul 2026
—
—
Draft Epics
Completed
15 Jul 2026
20 Jul 2026
—
—
Epic Walk-Through
Completed
21 Jul 2026
23 Jul 2026
—
—
Review + Validate Epics
Completed
24 Jul 2026
29 Jul 2026
—
—
Additional Business Inputs
In Progress
30 Jul 2026
3 Aug 2026
—
—
Epic Finalisation
Pending
4 Aug 2026
6 Aug 2026
—
—
Epic Solutioning (Wireframe or Demo)
Pending
7 Aug 2026
13 Aug 2026
—
—
Epic Playback
Pending
14 Aug 2026
17 Aug 2026
—
—
Provide Feedback
Pending
18 Aug 2026
19 Aug 2026
—
—
Epic Sign-Off
Milestone
Pending
20 Aug 2026
21 Aug 2026
—
—
Create User Stories
Pending
24 Aug 2026
27 Aug 2026
—
—
User Story Review
Pending
28 Aug 2026
1 Sep 2026
—
—
Sign Off User Stories
Milestone
Pending
2 Sep 2026
4 Sep 2026
—
—
Review and finalise business process
Completed
6 Jul 2026
9 Jul 2026
—
—
Source Policy
Overdue
10 Jul 2026
14 Jul 2026
—
—
Draft Epics
Pending
15 Jul 2026
20 Jul 2026
—
—
Epic Walk-Through
Pending
21 Jul 2026
23 Jul 2026
—
—
Review + Validate Epics
Pending
24 Jul 2026
29 Jul 2026
—
—
Additional Business Inputs
Pending
30 Jul 2026
3 Aug 2026
—
—
Epic Finalisation
Pending
4 Aug 2026
6 Aug 2026
—
—
Epic Solutioning (Wireframe or Demo)
Pending
7 Aug 2026
13 Aug 2026
—
—
Epic Playback
Pending
14 Aug 2026
17 Aug 2026
—
—
Provide Feedback
Pending
18 Aug 2026
19 Aug 2026
—
—
Epic Sign-Off
Milestone
Pending
20 Aug 2026
21 Aug 2026
—
—
Create User Stories
Pending
24 Aug 2026
27 Aug 2026
—
—
User Story Review
Pending
28 Aug 2026
1 Sep 2026
—
—
Sign Off User Stories
Milestone
Pending
2 Sep 2026
4 Sep 2026
—
—
Review and finalise business process
Completed
6 Jul 2026
9 Jul 2026
—
—
Source Policy
Completed
10 Jul 2026
14 Jul 2026
—
—
Draft Epics
Completed
15 Jul 2026
20 Jul 2026
—
—
Epic Walk-Through
Completed
21 Jul 2026
23 Jul 2026
—
—
Review + Validate Epics
In Progress
24 Jul 2026
29 Jul 2026
—
—
Additional Business Inputs
Completed
30 Jul 2026
3 Aug 2026
—
—
Epic Finalisation
Completed
4 Aug 2026
6 Aug 2026
—
—
Epic Solutioning (Wireframe or Demo)
In Progress
7 Aug 2026
13 Aug 2026
—
—
Epic Playback
Pending
14 Aug 2026
17 Aug 2026
—
—
Provide Feedback
Pending
18 Aug 2026
19 Aug 2026
—
—
Epic Sign-Off
Milestone
Pending
20 Aug 2026
21 Aug 2026
—
—
Create User Stories
Pending
24 Aug 2026
27 Aug 2026
—
—
User Story Review
Pending
28 Aug 2026
1 Sep 2026
—
—
Sign Off User Stories
Milestone
Pending
2 Sep 2026
4 Sep 2026
—
—
Review and finalise business process
Completed
3 Aug 2026
6 Aug 2026
—
—
Source Policy
In Progress
7 Aug 2026
11 Aug 2026
—
—
Draft Epics
Pending
12 Aug 2026
17 Aug 2026
—
—
Epic Walk-Through
To Do
18 Aug 2026
20 Aug 2026
—
—
Review + Validate Epics
To Do
21 Aug 2026
26 Aug 2026
—
—
Additional Business Inputs
To Do
27 Aug 2026
31 Aug 2026
—
—
Epic Finalisation
To Do
1 Sep 2026
3 Sep 2026
—
—
Epic Solutioning (Wireframe or Demo)
To Do
4 Sep 2026
10 Sep 2026
—
—
Epic Playback
To Do
11 Sep 2026
14 Sep 2026
—
—
Provide Feedback
To Do
15 Sep 2026
16 Sep 2026
—
—
Epic Sign-Off
Milestone
To Do
17 Sep 2026
18 Sep 2026
—
—
Create User Stories
To Do
21 Sep 2026
24 Sep 2026
—
—
User Story Review
To Do
28 Sep 2026
30 Sep 2026
—
—
Sign Off User Stories
Milestone
To Do
1 Oct 2026
5 Oct 2026
—
—
Review and finalise business process
To Do
3 Aug 2026
6 Aug 2026
—
—
Source Policy
To Do
7 Aug 2026
11 Aug 2026
—
—
Draft Epics
To Do
12 Aug 2026
17 Aug 2026
—
—
Epic Walk-Through
To Do
18 Aug 2026
20 Aug 2026
—
—
Review + Validate Epics
To Do
21 Aug 2026
26 Aug 2026
—
—
Additional Business Inputs
To Do
27 Aug 2026
31 Aug 2026
—
—
Epic Finalisation
To Do
1 Sep 2026
3 Sep 2026
—
—
Epic Solutioning (Wireframe or Demo)
To Do
4 Sep 2026
10 Sep 2026
—
—
Epic Playback
To Do
11 Sep 2026
14 Sep 2026
—
—
Provide Feedback
To Do
15 Sep 2026
16 Sep 2026
—
—
Epic Sign-Off
Milestone
To Do
17 Sep 2026
18 Sep 2026
—
—
Create User Stories
To Do
21 Sep 2026
24 Sep 2026
—
—
User Story Review
To Do
28 Sep 2026
30 Sep 2026
—
—
Sign Off User Stories
Milestone
To Do
1 Oct 2026
5 Oct 2026
—
—
Review and finalise business process
To Do
3 Aug 2026
6 Aug 2026
—
—
Source Policy
To Do
7 Aug 2026
11 Aug 2026
—
—
Draft Epics
To Do
12 Aug 2026
17 Aug 2026
—
—
Epic Walk-Through
To Do
18 Aug 2026
20 Aug 2026
—
—
Review + Validate Epics
To Do
21 Aug 2026
26 Aug 2026
—
—
Additional Business Inputs
To Do
27 Aug 2026
31 Aug 2026
—
—
Epic Finalisation
To Do
1 Sep 2026
3 Sep 2026
—
—
Epic Solutioning (Wireframe or Demo)
To Do
4 Sep 2026
10 Sep 2026
—
—
Epic Playback
To Do
11 Sep 2026
14 Sep 2026
—
—
Provide Feedback
To Do
15 Sep 2026
16 Sep 2026
—
—
Epic Sign-Off
Milestone
To Do
17 Sep 2026
18 Sep 2026
—
—
Create User Stories
To Do
21 Sep 2026
24 Sep 2026
—
—
User Story Review
To Do
28 Sep 2026
30 Sep 2026
—
—
Sign Off User Stories
Milestone
To Do
1 Oct 2026
5 Oct 2026
—
—
Review and finalise business process
To Do
3 Aug 2026
6 Aug 2026
—
—
Source Policy
To Do
7 Aug 2026
11 Aug 2026
—
—
Draft Epics
To Do
12 Aug 2026
17 Aug 2026
—
—
Epic Walk-Through
To Do
18 Aug 2026
20 Aug 2026
—
—
Review + Validate Epics
To Do
21 Aug 2026
26 Aug 2026
—
—
Additional Business Inputs
To Do
27 Aug 2026
31 Aug 2026
—
—
Epic Finalisation
To Do
1 Sep 2026
3 Sep 2026
—
—
Epic Solutioning (Wireframe or Demo)
To Do
4 Sep 2026
10 Sep 2026
—
—
Epic Playback
To Do
11 Sep 2026
14 Sep 2026
—
—
Provide Feedback
To Do
15 Sep 2026
16 Sep 2026
—
—
Epic Sign-Off
Milestone
To Do
17 Sep 2026
18 Sep 2026
—
—
Create User Stories
To Do
21 Sep 2026
24 Sep 2026
—
—
User Story Review
To Do
28 Sep 2026
30 Sep 2026
—
—
Sign Off User Stories
Milestone
To Do
1 Oct 2026
5 Oct 2026
—
—
Review and finalise business process
To Do
31 Aug 2026
3 Sep 2026
—
—
Source Policy
To Do
4 Sep 2026
8 Sep 2026
—
—
Draft Epics
To Do
9 Sep 2026
14 Sep 2026
—
—
Epic Walk-Through
To Do
15 Sep 2026
17 Sep 2026
—
—
Review + Validate Epics
To Do
18 Sep 2026
23 Sep 2026
—
—
Additional Business Inputs
To Do
24 Sep 2026
29 Sep 2026
—
—
Epic Finalisation
To Do
30 Sep 2026
2 Oct 2026
—
—
Epic Solutioning (Wireframe or Demo)
To Do
5 Oct 2026
9 Oct 2026
—
—
Epic Playback
To Do
12 Oct 2026
13 Oct 2026
—
—
Provide Feedback
To Do
14 Oct 2026
15 Oct 2026
—
—
Epic Sign-Off
Milestone
To Do
16 Oct 2026
19 Oct 2026
—
—
Create User Stories
To Do
20 Oct 2026
23 Oct 2026
—
—
User Story Review
To Do
26 Oct 2026
28 Oct 2026
—
—
Sign Off User Stories
Milestone
To Do
29 Oct 2026
2 Nov 2026
—
—
Review and finalise business process
To Do
31 Aug 2026
3 Sep 2026
—
—
Source Policy
To Do
4 Sep 2026
8 Sep 2026
—
—
Draft Epics
To Do
9 Sep 2026
14 Sep 2026
—
—
Epic Walk-Through
To Do
15 Sep 2026
17 Sep 2026
—
—
Review + Validate Epics
To Do
18 Sep 2026
23 Sep 2026
—
—
Additional Business Inputs
To Do
24 Sep 2026
29 Sep 2026
—
—
Epic Finalisation
To Do
30 Sep 2026
2 Oct 2026
—
—
Epic Solutioning (Wireframe or Demo)
To Do
5 Oct 2026
9 Oct 2026
—
—
Epic Playback
To Do
12 Oct 2026
13 Oct 2026
—
—
Provide Feedback
To Do
14 Oct 2026
15 Oct 2026
—
—
Epic Sign-Off
Milestone
To Do
16 Oct 2026
19 Oct 2026
—
—
Create User Stories
To Do
20 Oct 2026
23 Oct 2026
—
—
User Story Review
To Do
26 Oct 2026
28 Oct 2026
—
—
Sign Off User Stories
Milestone
To Do
29 Oct 2026
2 Nov 2026
—
—
Review and finalise business process
To Do
31 Aug 2026
3 Sep 2026
—
—
Source Policy
To Do
4 Sep 2026
8 Sep 2026
—
—
Draft Epics
To Do
9 Sep 2026
14 Sep 2026
—
—
Epic Walk-Through
To Do
15 Sep 2026
17 Sep 2026
—
—
Review + Validate Epics
To Do
18 Sep 2026
23 Sep 2026
—
—
Additional Business Inputs
To Do
24 Sep 2026
29 Sep 2026
—
—
Epic Finalisation
To Do
30 Sep 2026
2 Oct 2026
—
—
Epic Solutioning (Wireframe or Demo)
To Do
5 Oct 2026
9 Oct 2026
—
—
Epic Playback
To Do
12 Oct 2026
13 Oct 2026
—
—
Provide Feedback
To Do
14 Oct 2026
15 Oct 2026
—
—
Epic Sign-Off
Milestone
To Do
16 Oct 2026
19 Oct 2026
—
—
Create User Stories
To Do
20 Oct 2026
23 Oct 2026
—
—
User Story Review
To Do
26 Oct 2026
28 Oct 2026
—
—
Sign Off User Stories
Milestone
To Do
29 Oct 2026
2 Nov 2026
—
—
Review and finalise business process
To Do
31 Aug 2026
3 Sep 2026
—
—
Source Policy
To Do
4 Sep 2026
8 Sep 2026
—
—
Draft Epics
To Do
9 Sep 2026
14 Sep 2026
—
—
Epic Walk-Through
To Do
15 Sep 2026
17 Sep 2026
—
—
Review + Validate Epics
To Do
18 Sep 2026
23 Sep 2026
—
—
Additional Business Inputs
To Do
24 Sep 2026
29 Sep 2026
—
—
Epic Finalisation
To Do
30 Sep 2026
2 Oct 2026
—
—
Epic Solutioning (Wireframe or Demo)
To Do
5 Oct 2026
9 Oct 2026
—
—
Epic Playback
To Do
12 Oct 2026
13 Oct 2026
—
—
Provide Feedback
To Do
14 Oct 2026
15 Oct 2026
—
—
Epic Sign-Off
Milestone
To Do
16 Oct 2026
19 Oct 2026
—
—
Create User Stories
To Do
20 Oct 2026
23 Oct 2026
—
—
User Story Review
To Do
26 Oct 2026
28 Oct 2026
—
—
Sign Off User Stories
Milestone
To Do
29 Oct 2026
2 Nov 2026
—
—
Review and finalise business process
To Do
28 Sep 2026
1 Oct 2026
—
—
Source Policy
To Do
2 Oct 2026
6 Oct 2026
—
—
Draft Epics
To Do
7 Oct 2026
12 Oct 2026
—
—
Epic Walk-Through
To Do
13 Oct 2026
15 Oct 2026
—
—
Review + Validate Epics
To Do
16 Oct 2026
21 Oct 2026
—
—
Additional Business Inputs
To Do
22 Oct 2026
26 Oct 2026
—
—
Epic Finalisation
To Do
27 Oct 2026
29 Oct 2026
—
—
Epic Solutioning (Wireframe or Demo)
To Do
30 Oct 2026
6 Nov 2026
—
—
Epic Playback
To Do
9 Nov 2026
10 Nov 2026
—
—
Provide Feedback
To Do
11 Nov 2026
12 Nov 2026
—
—
Epic Sign-Off
Milestone
To Do
13 Nov 2026
16 Nov 2026
—
—
Create User Stories
To Do
17 Nov 2026
20 Nov 2026
—
—
User Story Review
To Do
23 Nov 2026
25 Nov 2026
—
—
Sign Off User Stories
Milestone
To Do
26 Nov 2026
30 Nov 2026
—
—
Review and finalise business process
Completed
6 Jul 2026
9 Jul 2026
—
—
Source Policy
Completed
10 Jul 2026
14 Jul 2026
—
—
Draft Epics
Completed
15 Jul 2026
20 Jul 2026
—
—
Epic Walk-Through
Completed
21 Jul 2026
23 Jul 2026
—
—
Review + Validate Epics
Pending
24 Jul 2026
29 Jul 2026
—
—
Additional Business Inputs
Pending
30 Jul 2026
3 Aug 2026
—
—
Epic Finalisation
Pending
4 Aug 2026
6 Aug 2026
—
—
Epic Solutioning (Wireframe or Demo)
Pending
7 Aug 2026
13 Aug 2026
—
—
Epic Playback
Pending
14 Aug 2026
17 Aug 2026
—
—
Provide Feedback
Pending
18 Aug 2026
19 Aug 2026
—
—
Epic Sign-Off
Milestone
Pending
20 Aug 2026
21 Aug 2026
—
—
Create User Stories
Pending
24 Aug 2026
27 Aug 2026
—
—
User Story Review
Pending
28 Aug 2026
1 Sep 2026
—
—
Sign Off User Stories
Milestone
Pending
2 Sep 2026
4 Sep 2026
—
—
Review and finalise business process
To Do
28 Sep 2026
1 Oct 2026
—
—
Source Policy
To Do
2 Oct 2026
6 Oct 2026
—
—
Draft Epics
To Do
7 Oct 2026
12 Oct 2026
—
—
Epic Walk-Through
To Do
13 Oct 2026
15 Oct 2026
—
—
Review + Validate Epics
To Do
16 Oct 2026
21 Oct 2026
—
—
Additional Business Inputs
To Do
22 Oct 2026
26 Oct 2026
—
—
Epic Finalisation
To Do
27 Oct 2026
29 Oct 2026
—
—
Epic Solutioning (Wireframe or Demo)
To Do
30 Oct 2026
6 Nov 2026
—
—
Epic Playback
To Do
9 Nov 2026
10 Nov 2026
—
—
Provide Feedback
To Do
11 Nov 2026
12 Nov 2026
—
—
Epic Sign-Off
Milestone
To Do
13 Nov 2026
16 Nov 2026
—
—
Create User Stories
To Do
17 Nov 2026
20 Nov 2026
—
—
User Story Review
To Do
23 Nov 2026
25 Nov 2026
—
—
Sign Off User Stories
Milestone
To Do
26 Nov 2026
30 Nov 2026
—
—
Review and finalise business process
To Do
28 Sep 2026
1 Oct 2026
—
—
Source Policy
To Do
2 Oct 2026
6 Oct 2026
—
—
Draft Epics
To Do
7 Oct 2026
12 Oct 2026
—
—
Epic Walk-Through
To Do
13 Oct 2026
15 Oct 2026
—
—
Review + Validate Epics
To Do
16 Oct 2026
21 Oct 2026
—
—
Additional Business Inputs
To Do
22 Oct 2026
26 Oct 2026
—
—
Epic Finalisation
To Do
27 Oct 2026
29 Oct 2026
—
—
Epic Solutioning (Wireframe or Demo)
To Do
30 Oct 2026
6 Nov 2026
—
—
Epic Playback
To Do
9 Nov 2026
10 Nov 2026
—
—
Provide Feedback
To Do
11 Nov 2026
12 Nov 2026
—
—
Epic Sign-Off
Milestone
To Do
13 Nov 2026
16 Nov 2026
—
—
Create User Stories
To Do
17 Nov 2026
20 Nov 2026
—
—
User Story Review
To Do
23 Nov 2026
25 Nov 2026
—
—
Sign Off User Stories
Milestone
To Do
26 Nov 2026
30 Nov 2026
—
—
Scroll the timeline for more epics · expand rows for activities
Build Readiness Funnel
Checkpoint counts = epics that completed that step. Build Ready = fully done epics
Draft Epic
Review Epic
Epic Progress by Stage
Draft Epic16%
Review Epic3%
Review Solution0%
User Stories0%
Upcoming Milestones (Next 30 Days)
- 21 Aug — Epic Sign-Off (FN-01B: Claims Adjustment)
- 21 Aug — Epic Sign-Off (GL-04: Transfer Request, Court Details …)
- 21 Aug — Epic Sign-Off (FN-03: Section 46 Final Contribution, D…)
- 21 Aug — Epic Sign-Off (GL-03: Charge Agreement, Outcome Manage…)
Executive Attention
- Blocked: Blocked infrastructure dependency — PL-04: Data Migration & Non-Functional Requirements
Current: Draft Epic — Review and finalise business process